NSF Product and Service Listings

These NSF Official Listings are current as of Monday, July 22, 2024 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=07180&Standard=061&



NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.


 
Axalta Coating Systems, LLC 
9800 Genard Road
Houston, TX 77041 
United States 
800-247-3880 
832-955-0200
Visit this company's website


Facility : Mt. Clemens, MI

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Fittings
AquaEC™ 2600[1] 2" - 42" CLD 23 EPOXY
AquaEC™ 2600EP[2] 2" - 42" CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 1
    Maximum Thinner: none
    Final Cure Time and Temperature: 10 minutes at 390°F
    Special Comments: Mix ratio of Part A (resin feed):Part B (pigment feed) is 4.8:1 by
    volume. Deionized water is added to the bath as needed to obtain 18–22% weight solids.
[2] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 1
    Final Cure Time and Temperature: 10 minutes at 390ºF
    Special Comments: Mix ratio of Part A:B is 4.8:1 by volume. Deionized water is added to
    the bath as needed to obtain 18-22% weight solids.

Coatings - Pipe
AquaEC™ 6100 (1K: 4023-2161)[4] >=1 1/2" CLD 23 EPOXY
AquaEC™ 6100 (2K: EK-2160/629-2161)[3] >=1 1/2" CLD 23 EPOXY

[3] Colors: Black - 2K version (2-part system)
    Number of Coats: 1
    Maximum Field Use Dry Thickness (in mils): 1.38 mils
    Final Cure Time and Temperature: 10 min at 330°F  
    Special Comments: Mix ratio Part A:B = 5:1. Coating is diluted with deionized water to a
    final solid content of 18-22% prior to application. Steel substrate is dipped into
    coating and it is applied with a voltage (160-350 V).  After a 2-3 minute dwell time the
    painted component is cured for 10 minutes at 330°F.
[4] Colors: Black - 1K version (pre-blended) 
    Number of Coats: 1
    Maximum Field Use Dry Thickness (in mils): 1.38 mils
    Final Cure Time and Temperature: 10 min at 330°F
    Special Comments: Coating is diluted with deionized water to a final solid content of
    18-22% prior to application.  Steel substrate is dipped into coating and is applied with
    a voltage (160-350V). After a 2-3 minute dwell time the painted component is cured for
    10 minutes at 330°F.

Coatings - Valve
AquaEC™ 2600[1] 2" - 42" CLD 23 EPOXY
AquaEC™ 2600EP[2] 2" - 42" CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 1
    Maximum Thinner: none
    Final Cure Time and Temperature: 10 minutes at 390°F
    Special Comments: Mix ratio of Part A (resin feed):Part B (pigment feed) is 4.8:1 by
    volume. Deionized water is added to the bath as needed to obtain 18–22% weight solids.
[2] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 1
    Final Cure Time and Temperature: 10 minutes at 390ºF
    Special Comments: Mix ratio of Part A:B is 4.8:1 by volume. Deionized water is added to
    the bath as needed to obtain 18-22% weight solids.



Facility : Hilliard, OH

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Fittings
Nap-Gard FBE Black Valve FBE 7-4510[1] >= 2" D. HOT PEC

[1] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60 mils
    Final Cure Time/Temperature: 3-10 minutes at 438°F - 475°F
    Special Comments: Preheat substrate to 400°F - 500°F

Coatings - Pipe
Nap-Gard FBE Black Valve FBE 7-4510[1] >= 2" D. HOT PEC
Nap-Gard Tan FBE Tank 7-3500T[2] >= 2" D. HOT PEC
Nap-Gard White FBE Tank Coating 7-3500[2] >= 2" D. HOT PEC
Tank Tan EFT-602-P7[2] >= 2" D. HOT PEC

[1] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60 mils
    Final Cure Time/Temperature: 3-10 minutes at 438°F - 475°F
    Special Comments: Preheat substrate to 400°F - 500°F
[2] Color: Tan, White
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 10
    Final Cure Time and Temperature: 10 minutes at 400°F
    Special Comments: Preheat part to 462°F before powder application.

Coatings - Pump
Nap-Gard FBE Black Valve FBE 7-4510[1] >= 2" D. HOT PEC

[1] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60 mils
    Final Cure Time/Temperature: 3-10 minutes at 438°F - 475°F
    Special Comments: Preheat substrate to 400°F - 500°F

Coatings - Tank
Nap-Gard FBE Black Valve FBE 7-4510[1] >= 5 gal. D. HOT PEC
Nap-Gard Tan FBE Tank 7-3500T[2] >= 5 gal. D. HOT PEC
Nap-Gard White FBE Tank Coating 7-3500[2] >= 2" D. HOT PEC
Tank Tan EFT-602-P7[2] >= 5 gal. D. HOT PEC

[1] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60 mils
    Final Cure Time/Temperature: 3-10 minutes at 438°F - 475°F
    Special Comments: Preheat substrate to 400°F - 500°F
[2] Color: Tan, White
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 10
    Final Cure Time and Temperature: 10 minutes at 400°F
    Special Comments: Preheat part to 462°F before powder application.

Coatings - Valve
Nap-Gard FBE Black Valve FBE 7-4510[1] >= 2" D. HOT PEC

[1] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60 mils
    Final Cure Time/Temperature: 3-10 minutes at 438°F - 475°F
    Special Comments: Preheat substrate to 400°F - 500°F



Facility : Houston, TX

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Fittings
7-4527 GHEEN GREEN FBE[1] >= 2" D. HOT PEC
NAP-GARD FBE FBE PIPE POWDER 7-2500[1] >= 2" D. HOT PEC
NAP-GARD FBE FBE PIPE POWDER 7-2501[1] >= 2" D. HOT PEC
NAP-GARD FBE GREEN FAST PIPE POWDER 7-2508FG[1] >= 2" D. HOT PEC
NAP-GARD FBE GREEN LONG GEL FBE 7-2508LG[1] >= 2" D. HOT PEC
NAP-GARD FBE GREEN STD GEL PIPE POWDER 7-2508[1] >= 2" D. HOT PEC
Nap-Gard FBE Black Valve FBE 7-4510[2] >= 2" D. HOT PEC
Nap-Gard FBE Blue FBE 7-2540[3] 8" - 48" D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500V[1] >=2” D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500VFG[1] >=2” D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500VSG[1] >=2” D. HOT PEC
Nap-Gard FBE Multipurpose Green FBE 7-0014[4] >= 1/2" C. HOT PEC

[1] Colors: Green, red
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 14
    Final Cure Time and Temperature: 60 seconds at 462°F
    Special Comments: Preheat pipe to 464°F before powder application.
[2] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 3 - 10 minutes at 438 - 475°F
    Special Comments: Preheat substrate to 400 - 500°F
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 14 
    Maximum Thinner: None
    Final Cure Time and Temperature: 120 seconds at 226°C (438°F), 80 seconds at 232°C
    (450°F), or 60 seconds at 239°C (463°F)
    Special Comments: Preheat substrate to 239°C (463°F) before powder application.
[4] Colors: Green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: None
    Final Cure Time and Temperature: 20 minutes at 200°C or 13 minutes at 220°C
    Special Comments: Preheat substrate to 425°F - 463°C before powder application.

Coatings - Pipe
7-4527 GHEEN GREEN FBE[1] >= 2" D. HOT PEC
NAP-GARD FBE FBE PIPE POWDER 7-2500[1] >= 2" D. HOT PEC
NAP-GARD FBE FBE PIPE POWDER 7-2501[1] >= 2" D. HOT PEC
NAP-GARD FBE GREEN FAST PIPE POWDER 7-2508FG[1] >= 2" D. HOT PEC
NAP-GARD FBE GREEN LONG GEL FBE 7-2508LG[1] >= 2" D. HOT PEC
NAP-GARD FBE GREEN STD GEL PIPE POWDER 7-2508[1] >= 2" D. HOT PEC
Nap-Gard FBE Black Valve FBE 7-4510[2] >= 2" D. HOT PEC
Nap-Gard FBE Blue FBE 7-2540[3] 8" - 48" D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500V[1] >=2” D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500VFG[1] >=2” D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500VSG[1] >=2” D. HOT PEC
Nap-Gard FBE Multipurpose Green FBE 7-0014[4] >= 1/2" C. HOT PEC
Nap-Gard Tan FBE Tank 7-3500T[6] >= 2" D. HOT PEC
Nap-Gard White FBE Tank Coating 7-3500[6] >= 2" D. HOT PEC
TANK TAN EFT-602-P7[6] >= 2" D. HOT PEC

[1] Colors: Green, red
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 14
    Final Cure Time and Temperature: 60 seconds at 462°F
    Special Comments: Preheat pipe to 464°F before powder application.
[2] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 3 - 10 minutes at 438 - 475°F
    Special Comments: Preheat substrate to 400 - 500°F
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 14 
    Maximum Thinner: None
    Final Cure Time and Temperature: 120 seconds at 226°C (438°F), 80 seconds at 232°C
    (450°F), or 60 seconds at 239°C (463°F)
    Special Comments: Preheat substrate to 239°C (463°F) before powder application.
[4] Colors: Green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: None
    Final Cure Time and Temperature: 20 minutes at 200°C or 13 minutes at 220°C
    Special Comments: Preheat substrate to 425°F - 463°C before powder application.
[6] Colors: Tan, White
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 10
    Final Cure Time: 10 minutes at 400°F
    Special Comments: Preheat part to 462°F before powder application.

Coatings - Pump
Nap-Gard FBE Black Valve FBE 7-4510[2] >= 2" D. HOT PEC

[2] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 3 - 10 minutes at 438 - 475°F
    Special Comments: Preheat substrate to 400 - 500°F

Coatings - Tank
7-4527 GHEEN GREEN FBE[1] >= 5 gal. D. HOT PEC
NAP-GARD FBE FBE PIPE POWDER 7-2500[1] >= 5 gal. D. HOT PEC
NAP-GARD FBE FBE PIPE POWDER 7-2501[1] >= 5 gal. D. HOT PEC
NAP-GARD FBE GREEN FAST PIPE POWDER 7-2508FG[1] >= 5 gal. D. HOT PEC
NAP-GARD FBE GREEN LONG GEL FBE 7-2508LG[1] >= 5 gal. D. HOT PEC
NAP-GARD FBE GREEN STD GEL PIPE POWDER 7-2508[1] >= 5 gal. D. HOT PEC
Nap-Gard FBE Black Valve FBE 7-4510[2] >= 5 gal. D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500V[1] >=5 gal. D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500VFG[1] >=5 gal. D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500VSG[1] >=5 gal. D. HOT PEC
Nap-Gard FBE Multipurpose Green FBE 7-0014[4] >= 5 gal. C. HOT PEC
Nap-Gard Tan FBE Tank 7-3500T[6] >= 5 gal. D. HOT PEC
Nap-Gard White FBE Tank Coating 7-3500[6] >= 5 gal . D. HOT PEC
Tank Tan EFT-602-P7[6] >= 5 gal. D. HOT PEC

[1] Colors: Green, red
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 14
    Final Cure Time and Temperature: 60 seconds at 462°F
    Special Comments: Preheat pipe to 464°F before powder application.
[2] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 3 - 10 minutes at 438 - 475°F
    Special Comments: Preheat substrate to 400 - 500°F
[4] Colors: Green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: None
    Final Cure Time and Temperature: 20 minutes at 200°C or 13 minutes at 220°C
    Special Comments: Preheat substrate to 425°F - 463°C before powder application.
[6] Colors: Tan, White
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 10
    Final Cure Time: 10 minutes at 400°F
    Special Comments: Preheat part to 462°F before powder application.

Coatings - Valve
7-4527 GHEEN GREEN FBE[1] >= 2" D. HOT PEC
NAP-GARD FBE FBE PIPE POWDER 7-2500[1] >= 2" D. HOT PEC
NAP-GARD FBE FBE PIPE POWDER 7-2501[1] >= 2" D. HOT PEC
NAP-GARD FBE GREEN FAST PIPE POWDER 7-2508FG[1] >= 2" D. HOT PEC
NAP-GARD FBE GREEN LONG GEL FBE 7-2508LG[1] >= 2 D. HOT PEC
NAP-GARD FBE GREEN STD GEL PIPE POWDER 7-2508[1] >= 2" D. HOT PEC
Nap-Gard FBE Black Valve FBE 7-4510[2] >= 2" D. HOT PEC
Nap-Gard FBE Blue FBE 7-2540[3] 8" - 48" D. HOT PEC
Nap-Gard FBE CV Red FBE 7-4500[7] 4" - 36" C. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500V[1] >=2” D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500VFG[1] >=2” D. HOT PEC
Nap-Gard FBE GREEN FBE PIPE POWDER 7-2500VSG[1] >=2” D. HOT PEC
Nap-Gard FBE Multipurpose Green FBE 7-0014[4] >= 1" C. HOT PEC

[1] Colors: Green, red
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 14
    Final Cure Time and Temperature: 60 seconds at 462°F
    Special Comments: Preheat pipe to 464°F before powder application.
[2] Colors: Black
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 3 - 10 minutes at 438 - 475°F
    Special Comments: Preheat substrate to 400 - 500°F
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 14 
    Maximum Thinner: None
    Final Cure Time and Temperature: 120 seconds at 226°C (438°F), 80 seconds at 232°C
    (450°F), or 60 seconds at 239°C (463°F)
    Special Comments: Preheat substrate to 239°C (463°F) before powder application.
[4] Colors: Green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: None
    Final Cure Time and Temperature: 20 minutes at 200°C or 13 minutes at 220°C
    Special Comments: Preheat substrate to 425°F - 463°C before powder application.
[7] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 30
    Final Cure Time and Temperature: Post-heat temperature and minimum cure times: 300°F for
    15 minutes, 325°F for 9 minutes, 350° for 7 minutes, 375° for 6 minutes, 400°F for 5
    minutes
    Special Comments: Preheat substrate to a minimum of 275°F

NOTE: Only products bearing the NSF Mark on the product, product packaging, and/or
      documentation shipped with the product are Certified.

Number of matching Manufacturers is 1
Number of matching Products is 72
Processing time was 0 seconds