NSF Product and Service Listings

These NSF Official Listings are current as of Monday, July 22, 2024 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=08420&Standard=061&



NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.


 
Akzo Nobel Coatings, Inc. 
Flying Hills Corporate Center
3 Commerce Drive 
Reading, PA 19607 
United States 
610-775-6600


Facility : Reading, PA

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Fittings
AA119QF INTERPON 100 10-1160 JERSEY CREAM[1] >= 2" CLD 23 PEC
AM106QF INTERPON 100 10-4081 RED BROWN[3] >= 2" CLD 23 PEC
HAF06QF RESICOAT R4-ES 10-1161 WHITE[4] >= 2" CLD 23 PEC
HNF12QF RESICOAT R4-ES 10-7314 BLACK[5] >= 1/2" CLD 23 PEC
HNF13QF RESICOAT PI 76-7001 BLACK[2] >= 1" D. HOT NP

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 20
    Final Cure Time and Temperature: 15 minutes at 350°F
    Special Comments: Preheat substrate to 350° F.
[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 18
    Final Cure Time and Temperature:: 1 minute at 475ºF	
    Special Comments: Preheat panel to 650ºF before coating
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Special Comments: Preheat part before powder application to 350°F for 20 minutes. Post
    heat to 350°F for 15 minutes.
[4] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 15
    Maximum Thinner: None
    Final Cure Time and Temperature: 20 minutes at 350°F
    Special Comments: Preheat substrate to 350°F
[5] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Special Comments: Preheat part before powder application to 350°F for 20 minutes. Post
    heat part to 350°F for 20 minutes.

Coatings - Pipe
AA119QF INTERPON 100 10-1160 JERSEY CREAM[1] >= 2" CLD 23 PEC
AM106QF INTERPON 100 10-4081 RED BROWN[3] >= 2" CLD 23 PEC
HAF06QF RESICOAT R4-ES 10-1161 WHITE[4] >= 2" CLD 23 PEC
HNF12QF RESICOAT R4-ES 10-7314 BLACK[5] >= 1/2" CLD 23 PEC
HNF13QF RESICOAT PI 76-7001 BLACK[2] >= 18" D. HOT NP

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 20
    Final Cure Time and Temperature: 15 minutes at 350°F
    Special Comments: Preheat substrate to 350° F.
[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 18
    Final Cure Time and Temperature:: 1 minute at 475ºF	
    Special Comments: Preheat panel to 650ºF before coating
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Special Comments: Preheat part before powder application to 350°F for 20 minutes. Post
    heat to 350°F for 15 minutes.
[4] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 15
    Maximum Thinner: None
    Final Cure Time and Temperature: 20 minutes at 350°F
    Special Comments: Preheat substrate to 350°F
[5] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Special Comments: Preheat part before powder application to 350°F for 20 minutes. Post
    heat part to 350°F for 20 minutes.

Coatings - Tank
AA119QF INTERPON 100 10-1160 JERSEY CREAM[1] >= 5 gal. CLD 23 PEC
AM106QF INTERPON 100 10-4081 RED BROWN[3] >= 5 gal. CLD 23 PEC
HAF06QF RESICOAT R4-ES 10-1161 WHITE[4] >= 5 gal. CLD 23 PEC
HLF93QF RESICOAT R4-ES 10-7208 GRAY[3] >= 5 gal. CLD 23 PEC
HNF12QF RESICOAT R4-ES 10-7314 BLACK[5] >= 5 gal. CLD 23 PEC
HNF13QF RESICOAT PI 76-7001 BLACK[2] >= 300 gal. D. HOT NP

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 20
    Final Cure Time and Temperature: 15 minutes at 350°F
    Special Comments: Preheat substrate to 350° F.
[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 18
    Final Cure Time and Temperature:: 1 minute at 475ºF	
    Special Comments: Preheat panel to 650ºF before coating
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Special Comments: Preheat part before powder application to 350°F for 20 minutes. Post
    heat to 350°F for 15 minutes.
[4] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 15
    Maximum Thinner: None
    Final Cure Time and Temperature: 20 minutes at 350°F
    Special Comments: Preheat substrate to 350°F
[5] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Special Comments: Preheat part before powder application to 350°F for 20 minutes. Post
    heat part to 350°F for 20 minutes.

Coatings - Valve
AA119QF INTERPON 100 10-1160 JERSEY CREAM[1] >= 2" CLD 23 PEC
HAF06QF RESICOAT R4-ES 10-1161 WHITE[4] >= 2" CLD 23 PEC
HNF12QF RESICOAT R4-ES 10-7314 BLACK[5] >= 1/2" CLD 23 PEC
HNF13QF RESICOAT PI 76-7001 BLACK[2] >= 4" D. HOT NP

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 20
    Final Cure Time and Temperature: 15 minutes at 350°F
    Special Comments: Preheat substrate to 350° F.
[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 18
    Final Cure Time and Temperature:: 1 minute at 475ºF	
    Special Comments: Preheat panel to 650ºF before coating
[4] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 15
    Maximum Thinner: None
    Final Cure Time and Temperature: 20 minutes at 350°F
    Special Comments: Preheat substrate to 350°F
[5] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 16
    Special Comments: Preheat part before powder application to 350°F for 20 minutes. Post
    heat part to 350°F for 20 minutes.


Number of matching Manufacturers is 1
Number of matching Products is 20
Processing time was 0 seconds