NSF Product and Service Listings

These NSF Official Listings are current as of Thursday, June 29, 2017 at 12:15 a.m. Eastern Time. Please contact NSF International to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=0K240&Standard=061&



NSF/ANSI 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings.


 
Ace Duraflo Systems, LLC 
3122 West Alpine Street
Santa Ana, CA 92704 
United States 
714-256-0220
Visit this company's website


Facility : # 1 USA

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Pipe - Immediate Return to Service
ADF 204[1] [2] >= 1/2" C. HOT EPOXY
ePIPE FRS[1] [3] [4] >= 1/2" C. HOT EPOXY
ePipe®[1] [2] >= 1/2" C. HOT EPOXY

[1] Evaluated for Immediate Return to Service.
[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 120
    Final Cure Time and Temperature: 22 hours at 77°F
    Special Comments: Mix ratio of A:B is 1:1 by volume or 69.5:100 by weight. Product shall
    be preconditioned to 100°F prior to mixing. Induction time is 15 minutes. Prior to the
    final cure, warm air (95°F) shall be blown over the coated surface for 2 hours. Rinse
    with water at 120°F for 1 hour prior to being placed into service.
[3] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 120
    Special Comments: Mix ratio of A:B is 2:1 by volume. Product shall be preconditioned to
    at least 95°F prior to mixing. Induction time is at least 10 minutes. Cure with air at a
    minimum of 95°F for at least 2 hours. Following the air cure, product cure shall
    continue in water at a minimum of 120°F for at least 15 minutes with a flow rate of 1 to
    5 liters per minute prior to being placed into service.
[4] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 120
    Special Comments: Mix ratio of A:B is 2:1 by volume. Product shall be preconditioned to
    at least 95°F prior to mixing. Induction time is at least 10 minutes. Cure with air at a
    minimum of 68°F for at least 45 minutes. Following the air cure, product cure shall
    continue in water at a minimum of 130°F for at least 45 minutes with a flow rate of 1 to
    5 liters per minute prior to being placed into service.


Number of matching Manufacturers is 1
Number of matching Products is 3
Processing time was 0 seconds