NSF Product and Service Listings
These NSF Official Listings are current as of Monday, July 22, 2024 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=1D310&Standard=061&
NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects
Drinking Water System Components - Health Effects
NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.
C.I.M. Industries Inc. | |
23 Elm Street | |
Peterborough, NH 03458 | |
United States | |
800-543-3458 | |
603-924-9481 |
Facility : # 1 USA
Protective (Barrier) Materials
Water | Water | |||
Water Contact | Contact | Contact | ||
Trade Designation | Size Restriction | Temp | Material | |
Coatings - Tank |
||||
CIM 61 Epoxy Primer[1] | >= 1000 gal. | CLD 23 | EPOXY | |
[1] Colors: 1211 Red Number of Coats: 1-3 Sequence of Coats: Any combination of Listed colors Maximum Field Use Dry Film Thickness (in mils): 1 coat - 10, 2-3 coats - 16 Maximum Thinner: 10% C.I.M. #4 Recoat Cure Time and Temperature: 5 hours at 75°F Final Cure Time and Temperature: 7 days at 75°F Special Comments: The mix ratio of Part A: part B is 1:1 by volume |
||||
Coatings - Pipe |
||||
CIM 61 Epoxy Primer[2] | >= 14" | CLD 23 | EPOXY | |
[2] Colors: 1211 Red Number of Coats: 2 Sequence of Coats: Any combination of Listed colors Maximum Field Use Dry Film Thickness (in mils): 17 Maximum Thinner: 5% C.I.M. #4 Recoat Cure Time and Temperature: 7 days at 75°F Final Cure Time and Temperature: 30 days at 75°F special Comments: The mix ratio of Part A:Part B is 1:1 by volume. |
||||
Coatings - Valve |
||||
CIM 61 Epoxy Primer[2] | >= 4" | CLD 23 | EPOXY | |
[2] Colors: 1211 Red Number of Coats: 2 Sequence of Coats: Any combination of Listed colors Maximum Field Use Dry Film Thickness (in mils): 17 Maximum Thinner: 5% C.I.M. #4 Recoat Cure Time and Temperature: 7 days at 75°F Final Cure Time and Temperature: 30 days at 75°F special Comments: The mix ratio of Part A:Part B is 1:1 by volume. |
Number of matching Manufacturers is 1
Number of matching Products is 3
Processing time was 0 seconds