NSF Product and Service Listings

These NSF Official Listings are current as of Monday, July 22, 2024 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=1D310&Standard=061&



NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.


 
C.I.M. Industries Inc. 
23 Elm Street
Peterborough, NH 03458 
United States 
800-543-3458 
603-924-9481


Facility : # 1 USA

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Tank
CIM 61 Epoxy Primer[1] >= 1000 gal. CLD 23 EPOXY

[1] Colors: 1211 Red
    Number of Coats: 1-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 1 coat - 10, 2-3 coats - 16
    Maximum Thinner: 10% C.I.M. #4
    Recoat Cure Time and Temperature: 5 hours at 75°F
    Final Cure Time and Temperature: 7 days at 75°F
    Special Comments: The mix ratio of Part A: part B is 1:1 by volume

Coatings - Pipe
CIM 61 Epoxy Primer[2] >= 14" CLD 23 EPOXY

[2] Colors: 1211 Red
    Number of Coats: 2
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 17
    Maximum Thinner: 5% C.I.M. #4
    Recoat Cure Time and Temperature: 7 days at 75°F
    Final Cure Time and Temperature: 30 days at 75°F
    special Comments: The mix ratio of Part A:Part B is 1:1 by volume.

Coatings - Valve
CIM 61 Epoxy Primer[2] >= 4" CLD 23 EPOXY

[2] Colors: 1211 Red
    Number of Coats: 2
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 17
    Maximum Thinner: 5% C.I.M. #4
    Recoat Cure Time and Temperature: 7 days at 75°F
    Final Cure Time and Temperature: 30 days at 75°F
    special Comments: The mix ratio of Part A:Part B is 1:1 by volume.


Number of matching Manufacturers is 1
Number of matching Products is 3
Processing time was 0 seconds