NSF Product and Service Listings
These NSF Official Listings are current as of Monday, July 22, 2024 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=82830&Standard=061&
NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects
Drinking Water System Components - Health Effects
NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.
Akzo Nobel Powder Coatings GmbH | |
Markwiesenstr. 50 | |
D-72770 Reutlingen | |
Germany | |
49 712 151 9190 |
Facility : Changzhou, China
Protective (Barrier) Materials
Water | Water | |||
Water Contact | Contact | Contact | ||
Trade Designation | Size Restriction | Temp | Material | |
Coatings - Fittings |
||||
Resicoat R4-ES HGF04R Red[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF01R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF10R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF14R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF24R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF42R Blue[1] | >= 1" | D. HOT | PEC | |
[1] Colors: Blue, Red Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 mils Recoat Cure Time and Temperature: 20 minutes at 428°F |
||||
Coatings - Valve |
||||
Resicoat R4-ES HGF04R Red[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF01R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF10R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF14R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF24R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF42R Blue[1] | >= 1" | D. HOT | PEC | |
[1] Colors: Blue, Red Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 mils Recoat Cure Time and Temperature: 20 minutes at 428°F |
[2] Colors: Rust Red Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Final Cure Time and Temperature: 20 minutes at 220°C Special comments: Preheat substrate to 200-220°C
Facility : Reutlingen, Germany
Joining and Sealing Materials
Water | Water | |||
Contact | Contact | |||
Trade Designation | Size | Temp | Material | |
Sealants |
||||
Resicoat Blue Mastic | [1] | CLD 23 | EPOXY | |
[1] Certified for use in 45 mm pipe and greater. |
Protective (Barrier) Materials
Water | Water | |||
Water Contact | Contact | Contact | ||
Trade Designation | Size Restriction | Temp | Material | |
Coatings - Fittings |
||||
Resicoat R4-ES HAF11R White[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HGF03R Red-Brown[2] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HGF10R Red[2] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF01R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF10R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF22R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF23R Saphir-Blue[3] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF57R Blue[4] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HGC07R Red-Brown[2] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC04R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC06R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC26R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC33R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC36R Saphir-Blue[5] | >= 1" | D. HOT | PEC | |
Resicoat R8-ES HJF97R Blue[5] | >= 1" | D. HOT | PEC | |
Resicoat R8-FB HJC37R Blue[5] | >= 1 in | D. HOT | PEC | |
[1] Colors: Blue, white Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Maximum Thinner: None Final Cure Time and Temperature: 20 minutes at 220°C Special Comments: Preheat temperature 200°C - 230°C [2] Color: Blue, red, red-brown Number of Coats: 1 Sequence of Coats: N/A Maximum Field Use Dry Film Thickness (in mils): 20 Maximum Thinner: None Recoat Cure Time and Temperature: 20 minutes at 220°C Special Comments: Preheat temperature 200°C - 230°C [3] Colors: Blue Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 12 Maximum Thinner: None Final Cure Time and Temperature: 20 minutes at 220°C Special Comments: Preheat temperature 200°C - 230°C [4] Colors: Blue Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Final Cure Time and Temperature: 20 minutes at 200°C Special Comments: Preheat substrate to 180°C - 220°C [5] Colors: Blue Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Maximum Thinner: No Thinner Final Cure Time and Temperature: 20 minutes at 220°C / 428°F Special Comments: Preheat substrate to 200°C - 230°C |
||||
Coatings - Pipe |
||||
Resicoat R4-ES HAF11R White[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HGF03R Red-Brown[2] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HGF10R Red | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJC06R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF01R Blue | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF10R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF22R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF57R Blue[4] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HGC07R Red-Brown[2] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC04R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC26R Blue | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC33R Blue[1] | >= 1" | D. HOT | PEC | |
[1] Colors: Blue, white Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Maximum Thinner: None Final Cure Time and Temperature: 20 minutes at 220°C Special Comments: Preheat temperature 200°C - 230°C [2] Color: Blue, red, red-brown Number of Coats: 1 Sequence of Coats: N/A Maximum Field Use Dry Film Thickness (in mils): 20 Maximum Thinner: None Recoat Cure Time and Temperature: 20 minutes at 220°C Special Comments: Preheat temperature 200°C - 230°C [4] Colors: Blue Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Final Cure Time and Temperature: 20 minutes at 200°C Special Comments: Preheat substrate to 180°C - 220°C |
||||
Coatings - Valve |
||||
Resicoat R4-ES HAF11R White[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HGF03R Red-Brown[2] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HGF10R Red[2] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF01R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF10R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF22R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF23R Saphir-Blue[3] | >= 1" | D. HOT | PEC | |
Resicoat R4-ES HJF57R Blue[4] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HGC07R Red-Brown[2] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC04R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC06R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC26R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC33R Blue[1] | >= 1" | D. HOT | PEC | |
Resicoat R4-FB HJC36R Saphir-Blue[5] | >= 1" | D. HOT | PEC | |
Resicoat R8-ES HJF97R Blue[5] | >= 1" | D. HOT | PEC | |
Resicoat R8-FB HJC37R Blue[5] | >= 1 in | D. HOT | PEC | |
[1] Colors: Blue, white Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Maximum Thinner: None Final Cure Time and Temperature: 20 minutes at 220°C Special Comments: Preheat temperature 200°C - 230°C [2] Color: Blue, red, red-brown Number of Coats: 1 Sequence of Coats: N/A Maximum Field Use Dry Film Thickness (in mils): 20 Maximum Thinner: None Recoat Cure Time and Temperature: 20 minutes at 220°C Special Comments: Preheat temperature 200°C - 230°C [3] Colors: Blue Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 12 Maximum Thinner: None Final Cure Time and Temperature: 20 minutes at 220°C Special Comments: Preheat temperature 200°C - 230°C [4] Colors: Blue Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Final Cure Time and Temperature: 20 minutes at 200°C Special Comments: Preheat substrate to 180°C - 220°C [5] Colors: Blue Number of Coats: 1 Maximum Field Use Dry Film Thickness (in mils): 20 Maximum Thinner: No Thinner Final Cure Time and Temperature: 20 minutes at 220°C / 428°F Special Comments: Preheat substrate to 200°C - 230°C |
Number of matching Manufacturers is 1
Number of matching Products is 57
Processing time was 0 seconds