NSF Product and Service Listings
These NSF Official Listings are current as of Monday, July 22, 2024 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=C0245737&Standard=061&
NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects
Drinking Water System Components - Health Effects
NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.
Chugoku Samhwa Paints, Ltd. | |
322, Gimhae-Daero 927 Beon-Gil, Hallim-M | |
Gimhae-Si, Gyeongsangnam-Do 621-873 | |
Korea, Republic of | |
82 55 3400 777 | |
Visit this company's website |
Facility : # 1 Gimhae-si, Gyeongsangnam-do, Korea
Protective (Barrier) Materials
Water | Water | |||
Water Contact | Contact | Contact | ||
Trade Designation | Size Restriction | Temp | Material | |
Coatings - Fittings [G] |
||||
CLEANKEEP 5000[1] | >= 4" | CLD 23 | EPOXY | |
CLEANKEEP 5000 QD[2] | >= 4" | CLD 23 | EPOXY | |
[1] Coating Notes: Colors: Primer: Pink, Topcoat: Light Grey, Cream, Light Blue Number Of Coats: 0-1 Primer, 1-2 Topcoat Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils per coat) Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None. Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH with paint temperature between 20°C - 30°C. After application in enclosed spaces, ventilation is necessary to ensure complete hardening and desirable film properties. The coating system requires immersion in fresh water for 5 days after the final cure of the topcoat; fresh water is then drained. [2] Coating Notes: Colors: Primer: Pink. Topcoat: Light Grey, Cream Number Of Coats: 0-1 Primer, 1-2 Topcoat Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils per coat) Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None. Recoat Cure Time and Temperature: 22 Hours at 20°C for Topcoat Final Cure Time/Temperature: 15 days at 20°C for Primer, 6 days at 20°C for Topcoat Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio of topcoat base:hardener is 79:21 by volume. Coating shall be applied below 85% RH with paint temperature between 15-25°C. After application in enclosed spaces, ventilation is necessary to ensure complete hardening and desirable film properties. The coating system requires immersion in fresh water for 5 days after the final cure of the topcoat; fresh water is then drained. [G] Product is Certified to NSF/ANSI 372 and conforms with the lead content requirements for “lead free” plumbing as defined by California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water Act. |
||||
Coatings - Pipe [G] |
||||
CLEANKEEP 5000[1] | >= 30" | CLD 23 | EPOXY | |
CLEANKEEP 5000 QD[2] | >= 30" | CLD 23 | EPOXY | |
[1] Coating Notes: Colors: Primer: Pink, Topcoat: Light Grey, Cream, Light Blue Number Of Coats: 0-1 Primer, 1-2 Topcoat Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils per coat) Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None. Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH with paint temperature between 20°C - 30°C. After application in enclosed spaces, ventilation is necessary to ensure complete hardening and desirable film properties. The coating system requires immersion in fresh water for 5 days after the final cure of the topcoat; fresh water is then drained. [2] Coating Notes: Colors: Primer: Pink. Topcoat: Light Grey, Cream Number Of Coats: 0-1 Primer, 1-2 Topcoat Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils per coat) Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None. Recoat Cure Time and Temperature: 22 Hours at 20°C for Topcoat Final Cure Time/Temperature: 15 days at 20°C for Primer, 6 days at 20°C for Topcoat Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio of topcoat base:hardener is 79:21 by volume. Coating shall be applied below 85% RH with paint temperature between 15-25°C. After application in enclosed spaces, ventilation is necessary to ensure complete hardening and desirable film properties. The coating system requires immersion in fresh water for 5 days after the final cure of the topcoat; fresh water is then drained. [G] Product is Certified to NSF/ANSI 372 and conforms with the lead content requirements for “lead free” plumbing as defined by California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water Act. |
||||
Coatings - Tank [G] |
||||
CLEANKEEP 5000[1] | >= 1,000 gal. | CLD 23 | EPOXY | |
CLEANKEEP 5000 QD[2] | >= 1,000 gal. | CLD 23 | EPOXY | |
[1] Coating Notes: Colors: Primer: Pink, Topcoat: Light Grey, Cream, Light Blue Number Of Coats: 0-1 Primer, 1-2 Topcoat Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils per coat) Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None. Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH with paint temperature between 20°C - 30°C. After application in enclosed spaces, ventilation is necessary to ensure complete hardening and desirable film properties. The coating system requires immersion in fresh water for 5 days after the final cure of the topcoat; fresh water is then drained. [2] Coating Notes: Colors: Primer: Pink. Topcoat: Light Grey, Cream Number Of Coats: 0-1 Primer, 1-2 Topcoat Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils per coat) Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None. Recoat Cure Time and Temperature: 22 Hours at 20°C for Topcoat Final Cure Time/Temperature: 15 days at 20°C for Primer, 6 days at 20°C for Topcoat Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio of topcoat base:hardener is 79:21 by volume. Coating shall be applied below 85% RH with paint temperature between 15-25°C. After application in enclosed spaces, ventilation is necessary to ensure complete hardening and desirable film properties. The coating system requires immersion in fresh water for 5 days after the final cure of the topcoat; fresh water is then drained. [G] Product is Certified to NSF/ANSI 372 and conforms with the lead content requirements for “lead free” plumbing as defined by California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water Act. |
||||
Coatings - Valve [G] |
||||
CLEANKEEP 5000[1] | >= 4" | CLD 23 | EPOXY | |
CLEANKEEP 5000 QD[2] | >= 4" | CLD 23 | EPOXY | |
[1] Coating Notes: Colors: Primer: Pink, Topcoat: Light Grey, Cream, Light Blue Number Of Coats: 0-1 Primer, 1-2 Topcoat Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils per coat) Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None. Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH with paint temperature between 20°C - 30°C. After application in enclosed spaces, ventilation is necessary to ensure complete hardening and desirable film properties. The coating system requires immersion in fresh water for 5 days after the final cure of the topcoat; fresh water is then drained. [2] Coating Notes: Colors: Primer: Pink. Topcoat: Light Grey, Cream Number Of Coats: 0-1 Primer, 1-2 Topcoat Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils per coat) Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None. Recoat Cure Time and Temperature: 22 Hours at 20°C for Topcoat Final Cure Time/Temperature: 15 days at 20°C for Primer, 6 days at 20°C for Topcoat Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio of topcoat base:hardener is 79:21 by volume. Coating shall be applied below 85% RH with paint temperature between 15-25°C. After application in enclosed spaces, ventilation is necessary to ensure complete hardening and desirable film properties. The coating system requires immersion in fresh water for 5 days after the final cure of the topcoat; fresh water is then drained. [G] Product is Certified to NSF/ANSI 372 and conforms with the lead content requirements for “lead free” plumbing as defined by California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water Act. |
Number of matching Manufacturers is 1
Number of matching Products is 8
Processing time was 0 seconds