NSF Product and Service Listings
These NSF Official Listings are current as of Thursday, January 29, 2026 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/Lead_Content/Listings.asp?Standard=372%2DADD&Company=C0245737&
NSF/ANSI/CAN 372
Drinking Water System Components - Lead Content
Drinking Water System Components - Lead Content
| Chugoku Samhwa Paints, Ltd. | |
| 322, Gimhae-Daero 927 Beon-Gil, Hallim-M | |
| Gimhae-Si, Gyeongsangnam-Do 621-873 | |
| Republic of Korea | |
| 82 55 3400 777 | |
| Visit this company's website |
Facility : # 1 Gimhae-si, Gyeongsangnam-do, Korea
Coatings - Fittings [LL] |
| CLEANKEEP 5000[1] |
[1] Coating Notes:
Colors: Primer: Pink. Topcoat: Light Grey, Cream, Light Blue
Number Of Coats: 0-1 Primer, 1-2 Topcoat
Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat
Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils
per coat)
Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None.
Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat
Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat
Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio
of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH
with paint temperature between 20°C - 30°C. After application in enclosed spaces,
ventilation is necessary to ensure complete hardening and desirable film properties.
The coating system requires immersion in fresh water for 5 days after the final cure
of the topcoat; fresh water is then drained.
[LL] Product conforms with lead content requirements for “lead free” plumbing as defined by
California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water
Act.
|
Coatings - Pipe [LL] |
| CLEANKEEP 5000[1] |
[1] Coating Notes:
Colors: Primer: Pink. Topcoat: Light Grey, Cream, Light Blue
Number Of Coats: 0-1 Primer, 1-2 Topcoat
Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat
Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils
per coat)
Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None.
Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat
Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat
Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio
of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH
with paint temperature between 20°C - 30°C. After application in enclosed spaces,
ventilation is necessary to ensure complete hardening and desirable film properties.
The coating system requires immersion in fresh water for 5 days after the final cure
of the topcoat; fresh water is then drained.
[LL] Product conforms with lead content requirements for “lead free” plumbing as defined by
California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water
Act.
|
Coatings - Tank [LL] |
| CLEANKEEP 5000[1] |
[1] Coating Notes:
Colors: Primer: Pink. Topcoat: Light Grey, Cream, Light Blue
Number Of Coats: 0-1 Primer, 1-2 Topcoat
Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat
Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils
per coat)
Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None.
Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat
Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat
Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio
of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH
with paint temperature between 20°C - 30°C. After application in enclosed spaces,
ventilation is necessary to ensure complete hardening and desirable film properties.
The coating system requires immersion in fresh water for 5 days after the final cure
of the topcoat; fresh water is then drained.
[LL] Product conforms with lead content requirements for “lead free” plumbing as defined by
California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water
Act.
|
Coatings - Valve [LL] |
| CLEANKEEP 5000[1] |
[1] Coating Notes:
Colors: Primer: Pink. Topcoat: Light Grey, Cream, Light Blue
Number Of Coats: 0-1 Primer, 1-2 Topcoat
Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat
Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils
per coat)
Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None.
Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat
Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat
Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio
of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH
with paint temperature between 20°C - 30°C. After application in enclosed spaces,
ventilation is necessary to ensure complete hardening and desirable film properties.
The coating system requires immersion in fresh water for 5 days after the final cure
of the topcoat; fresh water is then drained.
[LL] Product conforms with lead content requirements for “lead free” plumbing as defined by
California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water
Act.
|
Number of matching Manufacturers is 1
Number of matching Products is 4
Processing time was 0 seconds

