NSF Product and Service Listings

These NSF Official Listings are current as of Thursday, January 29, 2026 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/Lead_Content/Listings.asp?Standard=372%2DADD&Company=C0245737&


NSF/ANSI/CAN 372
Drinking Water System Components - Lead Content



 
Chugoku Samhwa Paints, Ltd. 
322, Gimhae-Daero 927 Beon-Gil, Hallim-M
Gimhae-Si, Gyeongsangnam-Do 621-873 
Republic of Korea 
82 55 3400 777
Visit this company's website

Facility : # 1 Gimhae-si, Gyeongsangnam-do, Korea


Coatings - Fittings [LL]
   CLEANKEEP 5000[1]

[1] Coating Notes:
    Colors: Primer: Pink. Topcoat: Light Grey, Cream, Light Blue
    Number Of Coats: 0-1 Primer, 1-2 Topcoat
    Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat
    Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils
    per coat)
    Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None.
    Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat
    Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat
    Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio
    of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH
    with paint temperature between 20°C - 30°C. After application in enclosed spaces,
    ventilation is necessary to ensure complete hardening and desirable film properties.
    The coating system requires immersion in fresh water for 5 days after the final cure
    of the topcoat; fresh water is then drained.
[LL] Product conforms with lead content requirements for “lead free” plumbing as defined by
     California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water
     Act.

Coatings - Pipe [LL]
   CLEANKEEP 5000[1]

[1] Coating Notes:
    Colors: Primer: Pink. Topcoat: Light Grey, Cream, Light Blue
    Number Of Coats: 0-1 Primer, 1-2 Topcoat
    Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat
    Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils
    per coat)
    Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None.
    Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat
    Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat
    Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio
    of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH
    with paint temperature between 20°C - 30°C. After application in enclosed spaces,
    ventilation is necessary to ensure complete hardening and desirable film properties.
    The coating system requires immersion in fresh water for 5 days after the final cure
    of the topcoat; fresh water is then drained.
[LL] Product conforms with lead content requirements for “lead free” plumbing as defined by
     California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water
     Act.

Coatings - Tank [LL]
   CLEANKEEP 5000[1]

[1] Coating Notes:
    Colors: Primer: Pink. Topcoat: Light Grey, Cream, Light Blue
    Number Of Coats: 0-1 Primer, 1-2 Topcoat
    Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat
    Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils
    per coat)
    Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None.
    Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat
    Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat
    Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio
    of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH
    with paint temperature between 20°C - 30°C. After application in enclosed spaces,
    ventilation is necessary to ensure complete hardening and desirable film properties.
    The coating system requires immersion in fresh water for 5 days after the final cure
    of the topcoat; fresh water is then drained.
[LL] Product conforms with lead content requirements for “lead free” plumbing as defined by
     California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water
     Act.

Coatings - Valve [LL]
   CLEANKEEP 5000[1]

[1] Coating Notes:
    Colors: Primer: Pink. Topcoat: Light Grey, Cream, Light Blue
    Number Of Coats: 0-1 Primer, 1-2 Topcoat
    Sequence Of Coats: 0-1 coat Primer followed by 1-2 coats Topcoat
    Maximum Field Use Dry Thickness(in mils): 2 mils Primer, 24 mils Topcoat (max 12 mils
    per coat)
    Maximum Thinner: Primer: 5% EPOXY THINNER I. Topcoat: None.
    Recoat Cure Time and Temperature: 32 Hours at 20°C for Topcoat
    Final Cure Time/Temperature: 15 days at 20°C for Primer, 7 days at 20°C for Topcoat
    Special Comments: Mix ratio of primer base:hardener is 71.5:28.5 by volume. Mix ratio
    of topcoat base:hardener is 81:19 by volume. Coating shall be applied below 85% RH
    with paint temperature between 20°C - 30°C. After application in enclosed spaces,
    ventilation is necessary to ensure complete hardening and desirable film properties.
    The coating system requires immersion in fresh water for 5 days after the final cure
    of the topcoat; fresh water is then drained.
[LL] Product conforms with lead content requirements for “lead free” plumbing as defined by
     California, Vermont, Maryland, and Louisiana state laws and the U.S. Safe Drinking Water
     Act.

Number of matching Manufacturers is 1
Number of matching Products is 4
Processing time was 0 seconds