NSF Product and Service Listings

These NSF Official Listings are current as of Thursday, October 10, 2024 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=00190&Standard=061&



NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.


 
3M / Electrical Markets Division 
3M Center, Building 201-2C-11
St. Paul, MN 55144 
United States 
651-736-9030
Visit this company's website


Facility : Angleton, TX

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Fittings
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 11G[1] >= 1/2" D. HOT PEC
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 4G[1] >= 1/2" D. HOT PEC
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 8G[1] >= 1/2" D. HOT PEC
ScotchKote 134[4] >= 1/2"[5] D. HOT PEC
Scotchkote 206N[2] >= 4" D. HOT PEC
Scotchkote 206N Extra LG[2] >= 4" D. HOT PEC
Scotchkote 206N Fluid Bed[2] >= 4" D. HOT PEC
Scotchkote 206N Long Gel[2] >= 4" D. HOT PEC

[1] Colors: Dark Green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum thinner: None
    Final Cure Time and Temperature: 6233W 4G: 30-45 seconds at 450°F; 6233W 8G: 60-90
    seconds at 450°F; 6233W 11G: 90-120 seconds at 450°F
    Special Comments: Preheat part to 425° - 488° F before application of powder.
[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 206N: 10 minutes at 400°F; 206N Extra LG: 16 minutes at
    400°F; 206N Fluid Bed: 10 minutes at 400°F; 206N Long Gel: 10 minutes at 400°F
[4] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 60
    Maximum Thinner: None
    Final Cure Time and Temperature: 25 minutes at 425° F
[5] Certified for a maximum surface area to volume ratio of 122.1 sq. in./L for pump end use.

Coatings - Pipe
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 11G[1] >= 1/2" D. HOT PEC
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 4G[1] >= 1/2" D. HOT PEC
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 8G[1] >= 1/2" D. HOT PEC
ScotchKote 134[4] >= 1/2"[5] D. HOT PEC
Scotchkote 206N[2] >= 4" D. HOT PEC
Scotchkote 206N Extra LG[2] >= 4" D. HOT PEC
Scotchkote 206N Fluid Bed[2] >= 4" D. HOT PEC
Scotchkote 206N Long Gel[2] >= 4" D. HOT PEC

[1] Colors: Dark Green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum thinner: None
    Final Cure Time and Temperature: 6233W 4G: 30-45 seconds at 450°F; 6233W 8G: 60-90
    seconds at 450°F; 6233W 11G: 90-120 seconds at 450°F
    Special Comments: Preheat part to 425° - 488° F before application of powder.
[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 206N: 10 minutes at 400°F; 206N Extra LG: 16 minutes at
    400°F; 206N Fluid Bed: 10 minutes at 400°F; 206N Long Gel: 10 minutes at 400°F
[4] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 60
    Maximum Thinner: None
    Final Cure Time and Temperature: 25 minutes at 425° F
[5] Certified for a maximum surface area to volume ratio of 122.1 sq. in./L for pump end use.

Coatings - Pump
ScotchKote 134[4] [5] D. HOT PEC
Scotchkote 206N[2] [3] >= 2" D. HOT PEC
Scotchkote 206N Extra LG[2] [3] >= 2" D. HOT PEC
Scotchkote 206N Fluid Bed[2] [3] >= 2" D. HOT PEC
Scotchkote 206N Long Gel[2] [3] >= 2" D. HOT PEC

[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 206N: 10 minutes at 400°F; 206N Extra LG: 16 minutes at
    400°F; 206N Fluid Bed: 10 minutes at 400°F; 206N Long Gel: 10 minutes at 400°F
[3] Certified for a maximum surface area to volume ratio of 122.1 sq. in./L. for pump end
    use.
[4] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 60
    Maximum Thinner: None
    Final Cure Time and Temperature: 25 minutes at 425° F
[5] Certified for a maximum surface area to volume ratio of 122.1 sq. in./L for pump end use.

Coatings - Tank
ScotchKote 134[4] >= 5 gal. D. HOT PEC
Scotchkote 206N[2] >= 5 gal. D. HOT PEC
Scotchkote 206N Extra LG[2] >= 5 gal. D. HOT PEC
Scotchkote 206N Fluid Bed[2] >= 5 gal. D. HOT PEC
Scotchkote 206N Long Gel[2] >= 5 gal. D. HOT PEC

[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 206N: 10 minutes at 400°F; 206N Extra LG: 16 minutes at
    400°F; 206N Fluid Bed: 10 minutes at 400°F; 206N Long Gel: 10 minutes at 400°F
[4] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 60
    Maximum Thinner: None
    Final Cure Time and Temperature: 25 minutes at 425° F

Coatings - Valve
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 11G[1] >= 1/2" D. HOT PEC
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 4G[1] >= 1/2" D. HOT PEC
3M Scotchkote Fusion Bonded Epoxy Coating 6233W 8G[1] >= 1/2" D. HOT PEC
ScotchKote 134[4] >= 1/2"[5] D. HOT PEC
Scotchkote 206N[2] >= 2" D. HOT PEC
Scotchkote 206N Extra LG[2] >= 2" D. HOT PEC
Scotchkote 206N Fluid Bed[2] >= 2" D. HOT PEC
Scotchkote 206N Long Gel[2] >= 2" D. HOT PEC

[1] Colors: Dark Green
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum thinner: None
    Final Cure Time and Temperature: 6233W 4G: 30-45 seconds at 450°F; 6233W 8G: 60-90
    seconds at 450°F; 6233W 11G: 90-120 seconds at 450°F
    Special Comments: Preheat part to 425° - 488° F before application of powder.
[2] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 60
    Final Cure Time and Temperature: 206N: 10 minutes at 400°F; 206N Extra LG: 16 minutes at
    400°F; 206N Fluid Bed: 10 minutes at 400°F; 206N Long Gel: 10 minutes at 400°F
[4] Number of Coats: 1
    Sequence of Coats: N/A
    Maximum Field Use Dry Film Thickness (in mils): 60
    Maximum Thinner: None
    Final Cure Time and Temperature: 25 minutes at 425° F
[5] Certified for a maximum surface area to volume ratio of 122.1 sq. in./L for pump end use.


Number of matching Manufacturers is 1
Number of matching Products is 34
Processing time was 0 seconds