NSF Product and Service Listings
These NSF Official Listings are current as of Monday, November 17, 2025 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=0E880&Standard=061&
NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects
Drinking Water System Components - Health Effects
NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.
| Chugoku Marine Paints, Ltd. | |
| 1-7, Meijishinkai | |
| Ohtake, Hiroshima, 739-0652 | |
| Japan | |
| 81 8275 7 8509 |
Facility : Kanzakigun, Sagaken, Japan
Protective (Barrier) Materials
| Water | Water | |||
| Water Contact | Contact | Contact | ||
| Trade Designation | Size Restriction | Temp | Material | |
|
Coatings - Tank |
||||
| CLEANKEEP 5500 Coating System[1] | >= 1500 gal. | CLD 23 | EPOXY | |
| CLEANKEEP 5500 Cream[1] | >= 1500 gal. | CLD 23 | EPOXY | |
| CLEANKEEP 5500 Light Gray[1] | >= 1500 gal. | CLD 23 | EPOXY | |
[1] Colors: Cream, light gray
Number of Coats: 1-2
Sequence of Coats: Any
Maximum Field Use Dry Film Thickness (in mils): 20
Maximum Thinner: None
Recoat Cure Time and Temperature: 32 hours at 20°C
Final Cure Time and Temperature: 10 days at 25°C
Special Comments: Mix ratio of Part A (base):Part B (hardener) is 88:12 by weight or
81:19 by volume. After curing, coating requires immersion in fresh water for 5 days;
fresh water is then drained. This is repeated for a total of 3 cycles before the coating
is placed into service. Induction period is 10 minutes.
|
||||
|
Coatings - Valve |
||||
| CLEANKEEP 5500 Coating System[1] | >= 4" | CLD 23 | EPOXY | |
| CLEANKEEP 5500 Cream[1] | >= 4" | CLD 23 | EPOXY | |
| CLEANKEEP 5500 Light Gray[1] | >= 4" | CLD 23 | EPOXY | |
[1] Colors: Cream, light gray
Number of Coats: 1-2
Sequence of Coats: Any
Maximum Field Use Dry Film Thickness (in mils): 20
Maximum Thinner: None
Recoat Cure Time and Temperature: 32 hours at 20°C
Final Cure Time and Temperature: 10 days at 25°C
Special Comments: Mix ratio of Part A (base):Part B (hardener) is 88:12 by weight or
81:19 by volume. After curing, coating requires immersion in fresh water for 5 days;
fresh water is then drained. This is repeated for a total of 3 cycles before the coating
is placed into service. Induction period is 10 minutes.
|
||||
|
Coatings - Pipe |
||||
| CLEANKEEP 5500 Coating System[1] | >= 36" | CLD 23 | EPOXY | |
| CLEANKEEP 5500 Cream[1] | >= 36" | CLD 23 | EPOXY | |
| CLEANKEEP 5500 Light Gray[1] | >= 36" | CLD 23 | EPOXY | |
[1] Colors: Cream, light gray
Number of Coats: 1-2
Sequence of Coats: Any
Maximum Field Use Dry Film Thickness (in mils): 20
Maximum Thinner: None
Recoat Cure Time and Temperature: 32 hours at 20°C
Final Cure Time and Temperature: 10 days at 25°C
Special Comments: Mix ratio of Part A (base):Part B (hardener) is 88:12 by weight or
81:19 by volume. After curing, coating requires immersion in fresh water for 5 days;
fresh water is then drained. This is repeated for a total of 3 cycles before the coating
is placed into service. Induction period is 10 minutes.
|
||||
|
Coatings - Fittings |
||||
| CLEANKEEP 5500 Coating System[1] | >= 3" | CLD 23 | EPOXY | |
| CLEANKEEP 5500 Cream[1] | >= 3" | CLD 23 | EPOXY | |
| CLEANKEEP 5500 Light Gray[1] | >= 3" | CLD 23 | EPOXY | |
[1] Colors: Cream, light gray
Number of Coats: 1-2
Sequence of Coats: Any
Maximum Field Use Dry Film Thickness (in mils): 20
Maximum Thinner: None
Recoat Cure Time and Temperature: 32 hours at 20°C
Final Cure Time and Temperature: 10 days at 25°C
Special Comments: Mix ratio of Part A (base):Part B (hardener) is 88:12 by weight or
81:19 by volume. After curing, coating requires immersion in fresh water for 5 days;
fresh water is then drained. This is repeated for a total of 3 cycles before the coating
is placed into service. Induction period is 10 minutes.
|
||||
Number of matching Manufacturers is 1
Number of matching Products is 12
Processing time was 0 seconds

