NSF Product and Service Listings

These NSF Official Listings are current as of Sunday, January 23, 2022 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=26690&Standard=061&



NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings.


 
Carboline Company 
350 Hanley Industrial Court
Brentwood, MO 63144 
United States 
314-644-1000


Facility : Dayton, NV

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Fittings
SP-7888 - 100% Solids Epoxy[1] >= 6" CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 120 
    Final Cure Time and Temperature: 4 days at 77°F 
    Special Comments: Mix ratio of A:B is 3:1 by volume.

Coatings - Pipe
SP-7888 - 100% Solids Epoxy[1] >= 8" CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 120 
    Final Cure Time and Temperature: 4 days at 77°F 
    Special Comments: Mix ratio of A:B is 3:1 by volume.

Coatings - Tank
SP-7888 - 100% Solids Epoxy[1] >= 500 gal. CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 120 
    Final Cure Time and Temperature: 4 days at 77°F 
    Special Comments: Mix ratio of A:B is 3:1 by volume.

Coatings - Valve
SP-7888 - 100% Solids Epoxy[1] >= 6" CLD 23 EPOXY

[1] Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 120 
    Final Cure Time and Temperature: 4 days at 77°F 
    Special Comments: Mix ratio of A:B is 3:1 by volume.



Facility : Green Bay, WI

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Tank
Plasite 4110[1] >= 3000 gal. CLD 23 VE

[1] Colors: Gray
    Number of Coats: 2-3
    Maximum Field Use Dry Film Thickness (in mils): 45
    Maximum Thinner: 20% Plasite Thinner #20 by volume
    Recoat Cure Time and Temperature: 10 hours at 75°F
    Final Cure Time and Temperature: Forced cure at 200°F for 4 hours
    Special Comments: Mix ratio of A:B:C:D is as packaged


Number of matching Manufacturers is 1
Number of matching Products is 5
Processing time was 0 seconds