NSF Product and Service Listings

These NSF Official Listings are current as of Saturday, May 28, 2022 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=36620&Standard=061&



NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings.


 
International Paint Inc. 
Heavy Duty Group
6001 Antoine Drive 
Houston, TX 77210-4806 
United States 
800-525-6824 
713-682-1711
Visit this company's website


Facility : Houston, TX

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Fittings
Bar Rust 233H Epoxy Coating [1] CLD 23 EPOXY
Bar-Rust DC233H1644 Low VOC Buff[2] >= 6" CLD 23 EPOXY
Bar-Rust DC233H3502 Low VOC Off-White[2] >= 6" CLD 23 EPOXY
Interline 850[3] >= 2" CLD 23 EPOXY
Interline 975P[4] [5] >= 1/4" CLD 23 EPOXY
Interseal 670HS[6] [7] >= 2" CLD 23 EPOXY
Interseal 670HS Buff LTC[8] >= 2" CLD 23 EPOXY

[1] Colors: Buff, black, off-white, oxide red
    Number of Coats: 2-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: 5% Thinner T-5 or T-4 by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 7 days at 77°F
    Special Comments: Mix ratio is 4:1 by volume or 6.5:1 by weight. Certification is for
    fittings 2" and greater, pipes 60" and greater, valves 2" and greater, and tanks 8,000
    gallons and greater.
    
    Colors: Buff, black, off-white, oxide red
    Number of Coats: 2-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 16
    Maximum Thinner: 5% Thinner T-5 or T-4 by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 10 days at 77°F
    Special Comments: Mix ratio is 4:1 by volume or 6.5:1 by weight. Certification is for
    fittings 1/2" and greater, pipes 18" and greater, valves 3/4" and greater, and tanks 300
    gallons and greater.
[2] Colors: off-white or buff
    Number of Coats: 2-3
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: 5% T-0 Zero VOC Thinner by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 14 days at 77°F
    Special Comments: Mix ratio of A:B is 4:1 by volume and 7.2:1 by weight.
[3] Colors: TLA 850/TLA 856 White, TLA851/TLA 856 Gray, TLA 852/TLA 856 Buff, TLA 72525/TLA
    856 Oxide Red, TLA 855/TLA 856 Cruiser Blue
    Number of Coats: 2
    Maximum Field Use Dry Film Thickness (in mils): 10
    Maximum Thinner: International Thinner GTA 415, 6% by volume
    Recoat Cure Time and Temperature: 16 hours at 75°F
    Final Cure Time and Temperature: 14 days at 75°F
    Special Comments: Mix ratio of Base:Curing Agent is 4:1 by volume.
[4] Colors: Cream, White
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum thinner: None
    Final Cure Time and Temperature: 3 days at 77°F
    Special Comments: Mix ratio of Part A:Part B is 2:1 by volume.
[5] Colors: Cream, White
    Number of Coats: 2
    Maximum Field Use Dry Film Thickness (in mils): 25 per coat
    Maximum thinner: None
    Final Cure Time and Temperature: 3 days at 77°F
    Special Comments: Mix ratio of Part A:Part B is 2:1 by volume.
[6] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 3
    Maximum Field Use Dry Thickness(in mils): 18
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[7] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 2
    Maximum Field Use Dry Thickness(in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[8] Number of Coats: 2
    Sequence of Coats: N/A
    Maximum Field Use Dry Thickness (in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77°F
    Special Comments: Mix ration of base:converter is 9.95:1 by weight

Coatings - Pipe
Bar Rust 233H Epoxy Coating [1] CLD 23 EPOXY
Interline 850[3] >= 48" CLD 23 EPOXY
Interline 975P[4] [5] >= 2" CLD 23 EPOXY
Interseal 670HS[6] [7] >= 6" CLD 23 EPOXY
Interseal 670HS Buff LTC[8] >= 120" CLD 23 EPOXY
Intershield 300HS[9] >= 6" CLD 23 EPOXY

[1] Colors: Buff, black, off-white, oxide red
    Number of Coats: 2-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: 5% Thinner T-5 or T-4 by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 7 days at 77°F
    Special Comments: Mix ratio is 4:1 by volume or 6.5:1 by weight. Certification is for
    fittings 2" and greater, pipes 60" and greater, valves 2" and greater, and tanks 8,000
    gallons and greater.
    
    Colors: Buff, black, off-white, oxide red
    Number of Coats: 2-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 16
    Maximum Thinner: 5% Thinner T-5 or T-4 by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 10 days at 77°F
    Special Comments: Mix ratio is 4:1 by volume or 6.5:1 by weight. Certification is for
    fittings 1/2" and greater, pipes 18" and greater, valves 3/4" and greater, and tanks 300
    gallons and greater.
[3] Colors: TLA 850/TLA 856 White, TLA851/TLA 856 Gray, TLA 852/TLA 856 Buff, TLA 72525/TLA
    856 Oxide Red, TLA 855/TLA 856 Cruiser Blue
    Number of Coats: 2
    Maximum Field Use Dry Film Thickness (in mils): 10
    Maximum Thinner: International Thinner GTA 415, 6% by volume
    Recoat Cure Time and Temperature: 16 hours at 75°F
    Final Cure Time and Temperature: 14 days at 75°F
    Special Comments: Mix ratio of Base:Curing Agent is 4:1 by volume.
[4] Colors: Cream, White
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum thinner: None
    Final Cure Time and Temperature: 3 days at 77°F
    Special Comments: Mix ratio of Part A:Part B is 2:1 by volume.
[5] Colors: Cream, White
    Number of Coats: 2
    Maximum Field Use Dry Film Thickness (in mils): 25 per coat
    Maximum thinner: None
    Final Cure Time and Temperature: 3 days at 77°F
    Special Comments: Mix ratio of Part A:Part B is 2:1 by volume.
[6] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 3
    Maximum Field Use Dry Thickness(in mils): 18
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[7] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 2
    Maximum Field Use Dry Thickness(in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[8] Number of Coats: 2
    Sequence of Coats: N/A
    Maximum Field Use Dry Thickness (in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77°F
    Special Comments: Mix ration of base:converter is 9.95:1 by weight
[9] Colors: ENA380 Bronze, ENA381 Aluminum
    Number of Coats: 2
    Sequence of Coats: 2 coats of either color in any combination.
    Maximum Field Use Dry Film Thickness (in mils): 10
    Recoat Cure Time and Temperature: 24 hours at 73°F
    Final Cure Time and Temperature: 30 days at 73°F
    Special Comments: Mix ratio of color base to curing agent is 3.73:1 by weight and 2.5:1
    by volume.

Coatings - Pump
Interseal 670HS[6] [7] >= 2" CLD 23 EPOXY

[6] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 3
    Maximum Field Use Dry Thickness(in mils): 18
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[7] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 2
    Maximum Field Use Dry Thickness(in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.

Coatings - Tank
Bar Rust 233H Epoxy Coating [1] CLD 23 EPOXY
Bar-Rust DC233H1644 Low VOC Buff[2] >= 500,000 gal. CLD 23 EPOXY
Bar-Rust DC233H3502 Low VOC Off-White[2] >= 500,000 gal. CLD 23 EPOXY
Interline 850[3] >= 1500 gal. CLD 23 EPOXY
Interline 975P[4] [5] >= 50 gal. CLD 23 EPOXY
Interseal 670HS[6] [7] >= 100 gal. CLD 23 EPOXY
Interseal 670HS Buff LTC[8] >= 90,000 gal CLD 23 EPOXY
Intershield 300HS[9] >= 1000 gal. CLD 23 EPOXY
Intershield 300V[10] >= 7000 gal. CLD 23 EPOXY

[1] Colors: Buff, black, off-white, oxide red
    Number of Coats: 2-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: 5% Thinner T-5 or T-4 by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 7 days at 77°F
    Special Comments: Mix ratio is 4:1 by volume or 6.5:1 by weight. Certification is for
    fittings 2" and greater, pipes 60" and greater, valves 2" and greater, and tanks 8,000
    gallons and greater.
    
    Colors: Buff, black, off-white, oxide red
    Number of Coats: 2-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 16
    Maximum Thinner: 5% Thinner T-5 or T-4 by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 10 days at 77°F
    Special Comments: Mix ratio is 4:1 by volume or 6.5:1 by weight. Certification is for
    fittings 1/2" and greater, pipes 18" and greater, valves 3/4" and greater, and tanks 300
    gallons and greater.
[2] Colors: off-white or buff
    Number of Coats: 2-3
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: 5% T-0 Zero VOC Thinner by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 14 days at 77°F
    Special Comments: Mix ratio of A:B is 4:1 by volume and 7.2:1 by weight.
[3] Colors: TLA 850/TLA 856 White, TLA851/TLA 856 Gray, TLA 852/TLA 856 Buff, TLA 72525/TLA
    856 Oxide Red, TLA 855/TLA 856 Cruiser Blue
    Number of Coats: 2
    Maximum Field Use Dry Film Thickness (in mils): 10
    Maximum Thinner: International Thinner GTA 415, 6% by volume
    Recoat Cure Time and Temperature: 16 hours at 75°F
    Final Cure Time and Temperature: 14 days at 75°F
    Special Comments: Mix ratio of Base:Curing Agent is 4:1 by volume.
[4] Colors: Cream, White
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum thinner: None
    Final Cure Time and Temperature: 3 days at 77°F
    Special Comments: Mix ratio of Part A:Part B is 2:1 by volume.
[5] Colors: Cream, White
    Number of Coats: 2
    Maximum Field Use Dry Film Thickness (in mils): 25 per coat
    Maximum thinner: None
    Final Cure Time and Temperature: 3 days at 77°F
    Special Comments: Mix ratio of Part A:Part B is 2:1 by volume.
[6] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 3
    Maximum Field Use Dry Thickness(in mils): 18
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[7] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 2
    Maximum Field Use Dry Thickness(in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[8] Number of Coats: 2
    Sequence of Coats: N/A
    Maximum Field Use Dry Thickness (in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77°F
    Special Comments: Mix ration of base:converter is 9.95:1 by weight
[9] Colors: ENA380 Bronze, ENA381 Aluminum
    Number of Coats: 2
    Sequence of Coats: 2 coats of either color in any combination.
    Maximum Field Use Dry Film Thickness (in mils): 10
    Recoat Cure Time and Temperature: 24 hours at 73°F
    Final Cure Time and Temperature: 30 days at 73°F
    Special Comments: Mix ratio of color base to curing agent is 3.73:1 by weight and 2.5:1
    by volume.
[10] Colors: ENA310 Bronze; ENA311 Aluminum
     Number of Coats: 2
     Sequence of Coats: Either coating may be used alone or together in any order.
     Maximum Field Use Dry Film Thickness (in mils): 10
     Recoat Cure Time and Temperature: 7 hours at 73°F (minimum)
     Final Cure Time and Temperature: 30 days at 73°F
     Special Comments: Mix ratio of color base:converter is 1:1 by volume.

Coatings - Valve
Bar Rust 233H Epoxy Coating [1] CLD 23 EPOXY
Bar-Rust DC233H1644 Low VOC Buff[2] >= 4" CLD 23 EPOXY
Bar-Rust DC233H3502 Low VOC Off-White[2] >= 4" CLD 23 EPOXY
Interline 850[3] >= 4" CLD 23 EPOXY
Interline 975P[4] [5] >= 1/4" CLD 23 EPOXY
Interseal 670HS[6] [7] >= 2" CLD 23 EPOXY
Interseal 670HS Buff LTC[8] >= 4" CLD 23 EPOXY

[1] Colors: Buff, black, off-white, oxide red
    Number of Coats: 2-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: 5% Thinner T-5 or T-4 by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 7 days at 77°F
    Special Comments: Mix ratio is 4:1 by volume or 6.5:1 by weight. Certification is for
    fittings 2" and greater, pipes 60" and greater, valves 2" and greater, and tanks 8,000
    gallons and greater.
    
    Colors: Buff, black, off-white, oxide red
    Number of Coats: 2-3
    Sequence of Coats: Any combination of Listed colors
    Maximum Field Use Dry Film Thickness (in mils): 16
    Maximum Thinner: 5% Thinner T-5 or T-4 by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 10 days at 77°F
    Special Comments: Mix ratio is 4:1 by volume or 6.5:1 by weight. Certification is for
    fittings 1/2" and greater, pipes 18" and greater, valves 3/4" and greater, and tanks 300
    gallons and greater.
[2] Colors: off-white or buff
    Number of Coats: 2-3
    Maximum Field Use Dry Film Thickness (in mils): 20
    Maximum Thinner: 5% T-0 Zero VOC Thinner by volume
    Recoat Cure Time and Temperature: 24 hours at 77°F
    Final Cure Time and Temperature: 14 days at 77°F
    Special Comments: Mix ratio of A:B is 4:1 by volume and 7.2:1 by weight.
[3] Colors: TLA 850/TLA 856 White, TLA851/TLA 856 Gray, TLA 852/TLA 856 Buff, TLA 72525/TLA
    856 Oxide Red, TLA 855/TLA 856 Cruiser Blue
    Number of Coats: 2
    Maximum Field Use Dry Film Thickness (in mils): 10
    Maximum Thinner: International Thinner GTA 415, 6% by volume
    Recoat Cure Time and Temperature: 16 hours at 75°F
    Final Cure Time and Temperature: 14 days at 75°F
    Special Comments: Mix ratio of Base:Curing Agent is 4:1 by volume.
[4] Colors: Cream, White
    Number of Coats: 1
    Maximum Field Use Dry Film Thickness (in mils): 50
    Maximum thinner: None
    Final Cure Time and Temperature: 3 days at 77°F
    Special Comments: Mix ratio of Part A:Part B is 2:1 by volume.
[5] Colors: Cream, White
    Number of Coats: 2
    Maximum Field Use Dry Film Thickness (in mils): 25 per coat
    Maximum thinner: None
    Final Cure Time and Temperature: 3 days at 77°F
    Special Comments: Mix ratio of Part A:Part B is 2:1 by volume.
[6] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 3
    Maximum Field Use Dry Thickness(in mils): 18
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[7] Colors: EGA010/EGA247 White, EGA093/EGA247 Buff, EGA002/EGA247 Black, EGA099/EGA247 Red
    Number Of Coats: 2
    Maximum Field Use Dry Thickness(in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77° F
    Special Comments: Mix ratio of base:converter is 10.16:1 by weight or 5.67:1 by volume.
[8] Number of Coats: 2
    Sequence of Coats: N/A
    Maximum Field Use Dry Thickness (in mils): 12
    Maximum Thinner: International Thinner GTA 415, 5% by volume
    Recoat Cure Time and Temperature: 18 hours at 77° F
    Final Cure Time/Temperature: 3 days at 77°F
    Special Comments: Mix ration of base:converter is 9.95:1 by weight

Patching Materials
Interline 975P[11] [12] CLD 23 EPOXY

[11] Colors: Cream, White
     Number of Coats: 2						
     Sequence of Coats: Pit Filler, Topcoat						
     Maximum Field Use Dry Film Thickness (in mils): 300 (250 Pit Filler, 50 Top Coat)						
     Maximum Thinner: None						
     Recoat Cure Time and Temperature: 16 hours at 77°F						
     Final Cure Time and Temperature: 7 days at 77°F						
     Special Comments: Mix ratio of Part A:B is 2:1 by volume; CABO-SIL TS-720 from Cabot or
     AEROSIL R 202 from Evonik may be added at a maximum of 5% by weight to pit filler layer.
     Pit filler is topcoated with up to 50 mils Interline 975P without silica.
[12] Certified for use as a patching material at 5% coverage of 50 gallon tanks and greater.


Number of matching Manufacturers is 1
Number of matching Products is 31
Processing time was 0 seconds