NSF Product and Service Listings
These NSF Official Listings are current as of Wednesday, November 19, 2025 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=C0236488&Standard=061&
NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects
Drinking Water System Components - Health Effects
NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.
| PINTURAS VILLADA SKC S.A. | |
| Ctra. Villalon 9-11 | |
| Villada/Palencia | |
| 34340 | |
| Spain | |
| 34 979 847 251 | |
| Visit this company's website |
Facility : Villada/Palencia, Spain
Protective (Barrier) Materials
| Water | Water | |||
| Water Contact | Contact | Contact | ||
| Trade Designation | Size Restriction | Temp | Material | |
|
Coatings - Fittings [G] |
||||
| Protecfull SFP 108[1] | >= 4" | D. HOT | PUR | |
| Protecfull SFP 108 Repair Kit[1] [2] | >= 4" | D. HOT | PUR | |
[1] Colors: White, blue
Number of Coats: 1-2
Maximum Field Use Dry Film Thickness (in mils): 600 microns (23.6 mils)
Re-coat Cure Time and Temperature: 3 days at 23°C
Final Cure Time and Temperature: 10 days at 23°C
Special Comments: Mix ratio of Part B:Part A (Polyol:Isocyanate) is 3:1 by volume.
Application by twin feed HOT airless spray at minimum 50ºC for each component.
[2] The Protecfull SFP 108 Repair Kit is only for use on areas coated with Protecfull SFP
108.
[G] Product is Certified to NSF/ANSI/CAN 372 and conforms with the lead content requirements
for "lead free" plumbing as defined by California, Vermont, Maryland, and Louisiana
state laws and the U.S. Safe Drinking Water Act.
|
||||
|
Coatings - Pipe [G] |
||||
| Protecfull SFP 108[1] | >= 4" | D. HOT | PUR | |
| Protecfull SFP 108 Repair Kit[1] [2] | >= 4" | D. HOT | PUR | |
[1] Colors: White, blue
Number of Coats: 1-2
Maximum Field Use Dry Film Thickness (in mils): 600 microns (23.6 mils)
Re-coat Cure Time and Temperature: 3 days at 23°C
Final Cure Time and Temperature: 10 days at 23°C
Special Comments: Mix ratio of Part B:Part A (Polyol:Isocyanate) is 3:1 by volume.
Application by twin feed HOT airless spray at minimum 50ºC for each component.
[2] The Protecfull SFP 108 Repair Kit is only for use on areas coated with Protecfull SFP
108.
[G] Product is Certified to NSF/ANSI/CAN 372 and conforms with the lead content requirements
for "lead free" plumbing as defined by California, Vermont, Maryland, and Louisiana
state laws and the U.S. Safe Drinking Water Act.
|
||||
|
Coatings - Pump [G] |
||||
| Protecfull SFP 108[1] | >= 4" | D. HOT | PUR | |
| Protecfull SFP 108 Repair Kit[1] [2] | >= 4" | D. HOT | PUR | |
[1] Colors: White, blue
Number of Coats: 1-2
Maximum Field Use Dry Film Thickness (in mils): 600 microns (23.6 mils)
Re-coat Cure Time and Temperature: 3 days at 23°C
Final Cure Time and Temperature: 10 days at 23°C
Special Comments: Mix ratio of Part B:Part A (Polyol:Isocyanate) is 3:1 by volume.
Application by twin feed HOT airless spray at minimum 50ºC for each component.
[2] The Protecfull SFP 108 Repair Kit is only for use on areas coated with Protecfull SFP
108.
[G] Product is Certified to NSF/ANSI/CAN 372 and conforms with the lead content requirements
for "lead free" plumbing as defined by California, Vermont, Maryland, and Louisiana
state laws and the U.S. Safe Drinking Water Act.
|
||||
|
Coatings - Tank [G] |
||||
| Protecfull SFP 108[1] | >= 20,000 gal. | D. HOT | PUR | |
| Protecfull SFP 108 Repair Kit[1] [2] | >= 20,000 gal. | D. HOT | PUR | |
[1] Colors: White, blue
Number of Coats: 1-2
Maximum Field Use Dry Film Thickness (in mils): 600 microns (23.6 mils)
Re-coat Cure Time and Temperature: 3 days at 23°C
Final Cure Time and Temperature: 10 days at 23°C
Special Comments: Mix ratio of Part B:Part A (Polyol:Isocyanate) is 3:1 by volume.
Application by twin feed HOT airless spray at minimum 50ºC for each component.
[2] The Protecfull SFP 108 Repair Kit is only for use on areas coated with Protecfull SFP
108.
[G] Product is Certified to NSF/ANSI/CAN 372 and conforms with the lead content requirements
for "lead free" plumbing as defined by California, Vermont, Maryland, and Louisiana
state laws and the U.S. Safe Drinking Water Act.
|
||||
|
Coatings - Valve [G] |
||||
| Protecfull SFP 108[1] | >= 4" | D. HOT | PUR | |
| Protecfull SFP 108 Repair Kit[1] [2] | >= 4" | D. HOT | PUR | |
[1] Colors: White, blue
Number of Coats: 1-2
Maximum Field Use Dry Film Thickness (in mils): 600 microns (23.6 mils)
Re-coat Cure Time and Temperature: 3 days at 23°C
Final Cure Time and Temperature: 10 days at 23°C
Special Comments: Mix ratio of Part B:Part A (Polyol:Isocyanate) is 3:1 by volume.
Application by twin feed HOT airless spray at minimum 50ºC for each component.
[2] The Protecfull SFP 108 Repair Kit is only for use on areas coated with Protecfull SFP
108.
[G] Product is Certified to NSF/ANSI/CAN 372 and conforms with the lead content requirements
for "lead free" plumbing as defined by California, Vermont, Maryland, and Louisiana
state laws and the U.S. Safe Drinking Water Act.
|
||||
NOTE: Only products bearing the NSF Mark on the product, product packaging, and/or
documentation shipped with the product are Certified.
Number of matching Manufacturers is 1
Number of matching Products is 10
Processing time was 0 seconds

