NSF Product and Service Listings
These NSF Official Listings are current as of Sunday, December 21, 2025 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=C0384827&Standard=061&
NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects
Drinking Water System Components - Health Effects
NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.
| Grauer & Weil India Ltd. | |
| Growel Corporate, Akurli Road | |
| Kandivali E, Mumbai, Maharashtra | |
| 400101 | |
| India | |
| 91 226 6993000 | |
| Visit this company's website |
Facility : Dadra, India
Protective (Barrier) Materials
| Water | Water | |||
| Water Contact | Contact | Contact | ||
| Trade Designation | Size Restriction | Temp | Material | |
|
Coatings - Fittings[1] |
||||
| Pentaline 1000 | >= 6" | CLD 23 | EPOXY | |
[1] Colors : Red Oxide, Grey, Off-White
Number Of Coats: 1-2
Maximum Field Use Dry Thickness(in mils): 20 mils
Recoat Cure Time and Temperature : 8 hours at 34°C
Final Cure Time/Temperature: 7 days at 34°C
Special Comments: Mix ratio of Part A:B is 3:1 by volume. Heat Part A and Part B to
65°C and mix before application.
|
||||
|
Coatings - Pipe[1] |
||||
| Pentaline 1000 | >=24" | CLD 23 | EPOXY | |
[1] Colors : Red Oxide, Grey, Off-White
Number Of Coats: 1-2
Maximum Field Use Dry Thickness(in mils): 20 mils
Recoat Cure Time and Temperature : 8 hours at 34°C
Final Cure Time/Temperature: 7 days at 34°C
Special Comments: Mix ratio of Part A:B is 3:1 by volume. Heat Part A and Part B to
65°C and mix before application.
|
||||
|
Coatings - Pump[1] |
||||
| Pentaline 1000 | >= 6" | CLD 23 | EPOXY | |
[1] Colors : Red Oxide, Grey, Off-White
Number Of Coats: 1-2
Maximum Field Use Dry Thickness(in mils): 20 mils
Recoat Cure Time and Temperature : 8 hours at 34°C
Final Cure Time/Temperature: 7 days at 34°C
Special Comments: Mix ratio of Part A:B is 3:1 by volume. Heat Part A and Part B to
65°C and mix before application.
|
||||
|
Coatings - Tank[1] |
||||
| Pentaline 1000 | >= 600 Gallons | CLD 23 | EPOXY | |
[1] Colors : Red Oxide, Grey, Off-White
Number Of Coats: 1-2
Maximum Field Use Dry Thickness(in mils): 20 mils
Recoat Cure Time and Temperature : 8 hours at 34°C
Final Cure Time/Temperature: 7 days at 34°C
Special Comments: Mix ratio of Part A:B is 3:1 by volume. Heat Part A and Part B to
65°C and mix before application.
|
||||
|
Coatings - Valve[1] |
||||
| Pentaline 1000 | >= 6" | CLD 23 | EPOXY | |
[1] Colors : Red Oxide, Grey, Off-White
Number Of Coats: 1-2
Maximum Field Use Dry Thickness(in mils): 20 mils
Recoat Cure Time and Temperature : 8 hours at 34°C
Final Cure Time/Temperature: 7 days at 34°C
Special Comments: Mix ratio of Part A:B is 3:1 by volume. Heat Part A and Part B to
65°C and mix before application.
|
||||
NOTE: Only products bearing the NSF Mark on the product, product packaging, and/or
documentation shipped with the product are Certified.
Number of matching Manufacturers is 1
Number of matching Products is 5
Processing time was 0 seconds

