NSF Product and Service Listings
These NSF Official Listings are current as of Saturday, July 12, 2025 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=C0455486&Standard=061&
NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects
Drinking Water System Components - Health Effects
NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.
Z Technologies Corporation | |
26500 Capitol Avenue | |
Redford, MI 48239 | |
United States | |
313-937-0710 |
Facility : Redford, MI
Protective (Barrier) Materials
Water | Water | |||
Water Contact | Contact | Contact | ||
Trade Designation | Size Restriction | Temp | Material | |
Coatings - Fittings |
||||
Z Shield® 2505 Black Dip Coating[1] | >= 1/2" | CLD 23 | ASPH | |
Z Shield™ 2000[2] | 3/4" - 120" | CLD 23 | ASPH | |
[1] Coating Notes: Colors: Black Number Of Coats: 1 Maximum Field Use Dry Thickness(in mils): 6 mils Final Cure Time/Temperature: 24 hours at 77°F Special Comments: Flush with tap water for 10 hours. [2] Coating Notes: Colors: Black Number Of Coats: 1-4 Maximum Field Use Dry Thickness(in mils): 5 (10 wet) Recoat Cure Time and Temperature: Immediately at 70°F Final Cure Time/Temperature: 7 days at 70°F |
||||
Coatings - Pipe |
||||
Z Shield® 2505 Black Dip Coating[1] | >= 3/4" | CLD 23 | ASPH | |
Z Shield™ 2000[2] | 3/4" - 120" | CLD 23 | ASPH | |
[1] Coating Notes: Colors: Black Number Of Coats: 1 Maximum Field Use Dry Thickness(in mils): 6 mils Final Cure Time/Temperature: 24 hours at 77°F Special Comments: Flush with tap water for 10 hours. [2] Coating Notes: Colors: Black Number Of Coats: 1-4 Maximum Field Use Dry Thickness(in mils): 5 (10 wet) Recoat Cure Time and Temperature: Immediately at 70°F Final Cure Time/Temperature: 7 days at 70°F |
||||
Coatings - Pump |
||||
Z Shield® 2505 Black Dip Coating[1] | >= 1/2" | CLD 23 | ASPH | |
[1] Coating Notes: Colors: Black Number Of Coats: 1 Maximum Field Use Dry Thickness(in mils): 6 mils Final Cure Time/Temperature: 24 hours at 77°F Special Comments: Flush with tap water for 10 hours. |
||||
Coatings - Tank |
||||
Z TECH TUG GUARD 3000[3] | >= 300 gal. | CLD 23 | ASPH | |
[3] Coating Notes: Colors: Gray, Red Oxide Number Of Coats: 1-2 Maximum Field Use Dry Thickness(in mils): 14 mils (7 mils/coat) Maximum Thinner: DI Water, 15% by volume Recoat Cure Time and Temperature: 6 hours at 70ºF Final Cure Time/Temperature: 7 days at 70ºF Special Comments: The substrate should be between 60 and 180ºF prior to coating. The coating should be preheated to 70 to 120ºF before application. After application and allowing this water based coating to dry, fill the tank with fresh water (60 to 80ºF) and allow the water to dwell in the tank 24 hours. Empty the tank and re-soak one more time, 24 hours per soak, before putting the tank into service. |
||||
Coatings - Valve |
||||
Z Shield® 2505 Black Dip Coating[1] | >= 1/2" | CLD 23 | ASPH | |
[1] Coating Notes: Colors: Black Number Of Coats: 1 Maximum Field Use Dry Thickness(in mils): 6 mils Final Cure Time/Temperature: 24 hours at 77°F Special Comments: Flush with tap water for 10 hours. |
Number of matching Manufacturers is 1
Number of matching Products is 7
Processing time was 0 seconds