NSF Product and Service Listings

These NSF Official Listings are current as of Saturday, March 28, 2026 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.

Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=C0880023&Standard=061&



NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.


 
Asphalt Cutbacks, Inc. 
3000 Gary Ave.
East Chicago, IN 46312 
United States 
219-398-4230
Visit this company's website


Facility : East Chicago, IN

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings- Fittings[1]
ACI Pipe Coat ID >= 1/2" C. HOT ASPH
ACI Pipe Coat OD >= 1/2" C. HOT ASPH

[1] Colors: Black
    Number of Coats: 1-3
    Maximum field use dry film thickness (in mils): 3
    Recoat cure time and temperature: 1 day at 21°C (70°F)
    Final cure time and temperature: 2 day at 21°C (70°F)

Coatings- Pipe[1]
ACI Pipe Coat ID >= 1/2" C. HOT ASPH
ACI Pipe Coat OD >= 1/2" C. HOT ASPH

[1] Colors: Black
    Number of Coats: 1-3
    Maximum field use dry film thickness (in mils): 3
    Recoat cure time and temperature: 1 day at 21°C (70°F)
    Final cure time and temperature: 2 day at 21°C (70°F)

Coatings- Valve[1]
ACI Pipe Coat ID >= 1/2" C. HOT ASPH
ACI Pipe Coat OD >= 1/2" C. HOT ASPH

[1] Colors: Black
    Number of Coats: 1-3
    Maximum field use dry film thickness (in mils): 3
    Recoat cure time and temperature: 1 day at 21°C (70°F)
    Final cure time and temperature: 2 day at 21°C (70°F)


Number of matching Manufacturers is 1
Number of matching Products is 6
Processing time was 0 seconds