NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects

NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.


 
Enecon Corporation 
6 Platinum Court 
Medford, NY 11763 
United States 
800-436-3266 
516-349-0022


Facility : Medford, NY

Protective (Barrier) Materials

    Water Water
  Water Contact Contact Contact
Trade Designation Size Restriction Temp Material

Coatings - Fittings
CHEMCLAD SC[1] [2] >= 6" CLD 23 EPOXY
CHEMCLAD SC/P[1] [2] >= 6" CLD 23 EPOXY

[1] Colors: Gray, haze gray, white
    Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
    Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
    mils (7 mils per coat)).
    Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
    overcoating with CHEMCLAD SC, is
    90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
    Final Cure Time and Temperature: 4 days at 77°F
    Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
    Base:Activator is 3.57:1 by weight).
    CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
    CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
    Chemclad P4C.

Coatings - Pipe
CHEMCLAD SC[1] [2] >= 12" CLD 23 EPOXY
CHEMCLAD SC/P[1] [2] >= 12" CLD 23 EPOXY

[1] Colors: Gray, haze gray, white
    Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
    Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
    mils (7 mils per coat)).
    Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
    overcoating with CHEMCLAD SC, is
    90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
    Final Cure Time and Temperature: 4 days at 77°F
    Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
    Base:Activator is 3.57:1 by weight).
    CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
    CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
    Chemclad P4C.

Coatings - Pump
CHEMCLAD SC[1] [2] >= 4" CLD 23 EPOXY
CHEMCLAD SC/P[1] [2] >= 4" CLD 23 EPOXY

[1] Colors: Gray, haze gray, white
    Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
    Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
    mils (7 mils per coat)).
    Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
    overcoating with CHEMCLAD SC, is
    90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
    Final Cure Time and Temperature: 4 days at 77°F
    Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
    Base:Activator is 3.57:1 by weight).
    CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
    CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
    Chemclad P4C.

Coatings - Tank
CHEMCLAD SC[1] [2] >= 25 gal. CLD 23 EPOXY
CHEMCLAD SC/P[1] [2] >= 25 gal. CLD 23 EPOXY

[1] Colors: Gray, haze gray, white
    Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
    Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
    mils (7 mils per coat)).
    Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
    overcoating with CHEMCLAD SC, is
    90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
    Final Cure Time and Temperature: 4 days at 77°F
    Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
    Base:Activator is 3.57:1 by weight).
    CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
    CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
    Chemclad P4C.

Coatings - Valve
CHEMCLAD SC[1] [2] >= 6" CLD 23 EPOXY
CHEMCLAD SC/P[1] [2] >= 6" CLD 23 EPOXY

[1] Colors: Gray, haze gray, white
    Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
    Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
    mils (7 mils per coat)).
    Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
    overcoating with CHEMCLAD SC, is
    90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
    Final Cure Time and Temperature: 4 days at 77°F
    Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
    Base:Activator is 3.57:1 by weight).
    CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
    CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
    Chemclad P4C.


Number of matching Manufacturers is 1