NSF Product and Service Listings
These NSF Official Listings are current as of Sunday, May 31, 2026 at 12:15 a.m. Eastern Time. Please contact NSF to confirm the status of any Listing, report errors, or make suggestions.
Alert: NSF is concerned about fraudulent downloading and manipulation of website text. Always confirm this information by clicking on the below link for the most accurate information: http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=1F250&Standard=061&
NSF/ANSI/CAN 61
Drinking Water System Components - Health Effects
Drinking Water System Components - Health Effects
NOTE: Unless otherwise indicated for Materials, Certification is only for the Water Contact Material shown in the Listing. Click here for a list of Abbreviations used in these Listings. Click here for the definitions of Water Contact Temperatures denoted in these Listings. Products certified to NSF/ANSI/CAN 61 comply with the health effects criteria in NSF/ANSI/CAN 600.
| Enecon Corporation | |
| 6 Platinum Court | ![]() |
| Medford, NY 11763 | |
| United States | |
| 800-436-3266 | |
| 516-349-0022 |
Facility : Medford, NY
Protective (Barrier) Materials
| Water | Water | |||
| Water Contact | Contact | Contact | ||
| Trade Designation | Size Restriction | Temp | Material | |
|
Coatings - Fittings |
||||
| CHEMCLAD SC[1] [2] | >= 6" | CLD 23 | EPOXY | |
| CHEMCLAD SC/P[1] [2] | >= 6" | CLD 23 | EPOXY | |
[1] Colors: Gray, haze gray, white
Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
mils (7 mils per coat)).
Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
overcoating with CHEMCLAD SC, is
90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
Final Cure Time and Temperature: 4 days at 77°F
Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
Base:Activator is 3.57:1 by weight).
CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
Chemclad P4C.
|
||||
|
Coatings - Pipe |
||||
| CHEMCLAD SC[1] [2] | >= 12" | CLD 23 | EPOXY | |
| CHEMCLAD SC/P[1] [2] | >= 12" | CLD 23 | EPOXY | |
[1] Colors: Gray, haze gray, white
Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
mils (7 mils per coat)).
Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
overcoating with CHEMCLAD SC, is
90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
Final Cure Time and Temperature: 4 days at 77°F
Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
Base:Activator is 3.57:1 by weight).
CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
Chemclad P4C.
|
||||
|
Coatings - Pump |
||||
| CHEMCLAD SC[1] [2] | >= 4" | CLD 23 | EPOXY | |
| CHEMCLAD SC/P[1] [2] | >= 4" | CLD 23 | EPOXY | |
[1] Colors: Gray, haze gray, white
Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
mils (7 mils per coat)).
Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
overcoating with CHEMCLAD SC, is
90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
Final Cure Time and Temperature: 4 days at 77°F
Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
Base:Activator is 3.57:1 by weight).
CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
Chemclad P4C.
|
||||
|
Coatings - Tank |
||||
| CHEMCLAD SC[1] [2] | >= 25 gal. | CLD 23 | EPOXY | |
| CHEMCLAD SC/P[1] [2] | >= 25 gal. | CLD 23 | EPOXY | |
[1] Colors: Gray, haze gray, white
Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
mils (7 mils per coat)).
Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
overcoating with CHEMCLAD SC, is
90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
Final Cure Time and Temperature: 4 days at 77°F
Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
Base:Activator is 3.57:1 by weight).
CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
Chemclad P4C.
|
||||
|
Coatings - Valve |
||||
| CHEMCLAD SC[1] [2] | >= 6" | CLD 23 | EPOXY | |
| CHEMCLAD SC/P[1] [2] | >= 6" | CLD 23 | EPOXY | |
[1] Colors: Gray, haze gray, white
Number of Coats: CHEMCLAD SC/P (1 coat). CHEMCLAD SC (2-4 coats).
Maximum Field Use Dry Film Thickness (in mils): CHEMCLAD SC/P (10 mils). CHEMCLAD SC (28
mils (7 mils per coat)).
Recoat Cure Time and Temperature: The minimum cure time for CHEMCLAD SC/P, before
overcoating with CHEMCLAD SC, is
90 minutes at 77°F. Re-coat with CHEMCLAD SC is 24 hours at 77°F.
Final Cure Time and Temperature: 4 days at 77°F
Special Comments: Mix ratio of Base:CHEMCLAD SC/P is the undercoat (Mix ratio of
Base:Activator is 3.57:1 by weight).
CHEMCLAD SC is the overcoat (Mix ratio of Base:Activator is 3.29:1 by weight).
CHEMCLAD SC/P is only to be used under CHEMCLAD SC.
[2] CHEMCLAD SC/P is only meant to be used under CHEMCLAD SC. Certification does not include
Chemclad P4C.
|
||||
Number of matching Manufacturers is 1
Number of matching Products is 10
Processing time was 0 seconds


